|
Sn.
|
Name Of The Project |
Client |
Location |
| 1 |
Construction and Upgradation to NHSL Specification from Design Chainage Km 60+562 to Km 96+577) of Road Hanle - Chumar under Project Himank in Ladakh (UT) on EPC Mode |
Border Road Organization |
Ladakh |
| 2 |
Construction of High-Altitude Hill Road to Indo China Border from Silungla Base to ITBP Post Silungla Base in the Union Territory of Ladakh for ITBP |
CPWD |
Ladakh |
| 3 |
Construction of High-Altitude Hill Road to Indo China Border from Umlungzing to ITBP Post Umlungzing in the Union Territory of Ladakh for ITBP |
CPWD |
Ladakh |
| 4 |
Construction of High-Altitude Hill Road to Indo China Border from Hena to ITBP Post Hena in the Union Territory of Ladakh for ITBP |
CPWD |
Ladakh |
| 5 |
Construction of High-Altitude Hill Road to Indo China Border from Nyakmikle to ITBP Post Nyakmikle in the Union Territory of Ladakh for ITBP |
CPWD |
Ladakh |
| 6 |
Construction and Upgradation to NHDL specification from Km 7+900 to Km 18+000 (Design Chainage Km 7+900 to Km 16+904) (Km 0+000 reckoned at Khalsar) of Road Khalsar-Agham under Project Himank in Ladakh (UT) on EPC mode |
Border Road Organization |
Ladakh |
| 7 |
Construction & Design for the Fence & Road at DTR (Dampa Tiger Reserve) in Indo- Bangladesh Border from near Rajeev Nagar to Silsuri in Mizoram State |
NBCC |
Mizoram |
| 8 |
Construction of alignment from Thangu to Muguthang with associated bridges from Design Ch. 0+00 to Design Ch. 32+265 in the State of Sikkim |
CPWD |
Sikkim |
| 9 |
Construction of 4-lane divided highway from km 2.8 to km 8.3 and km 20.0 to km 61 from Obedullaganj to Itarsi section of NH – 69 in the State of Madhya Pradesh |
NHAI |
Madhya Pradesh |
| 10 |
Development of Major and Minor roads with associated culverts within premises of Wave City Phase – II on NH -24 Ghaziabad |
Wave Group |
Ghaziabad |
| 11 |
Design and Construction of Balipara - Charduar Tawang road section of National Highway – 13 from existing km 229+000 and km 247+600 (design Ch. 0.000 to Ch. 12.040) including two number of Tunnels having lengths of 1790 meter and 475 meter in the State of Arunachal Pradesh on EPC mode |
Border Road Organization |
Arunachal Pradesh |
| 12 |
Consultancy Services for preparation of Detailed Project Report, detailed financial analysis & detailed Traffic Survey for two laning including project design, planning and project preparation, surveys, devise suitable financing model and contract award structure for making the project viable under Private Sector Participation, bid management and preparation of tender documents, to perform detail engineering for the project including detailed cost estimates and land acquisition plans etc, in the State of Madhya Pradesh. |
MPRDC |
Madhya Pradesh |
| 13 |
Consultancy services for Technical, Economical and Financial Viability of the project and prepare feasibility report for rehabilitation and upgrading of the existing State Highways to two lane with hard shoulder configuration through Public Private partnership (PPP) on Design, Build Finance, Operate and Transfer (DBFOT) basis, in the State of Rajasthan. |
Public Works Department, Rajasthan |
Rajasthan |
| 14 |
Consultancy services Preparation of Detailed Project Report for Construction and Improvement of Road Shergaon—Morshing—Rupa Road. Phudung—Mandala—Debrabu—NGG—BJ Gompa — LGG — Muktokhet — Teli — Bomdir —Tawang to Double Lane Specifications in West Kameng and Tawang District of Arunachal Pradesh |
Border Road Organization |
Arunachal Pradesh |
| 15 |
Consultancy Services for preparation of DPR and detailed design of Roads and Bridges etc. for construction of High Altitude Hill Roads to Indo-China Border under Phase-II in the State of Arunachal Pradesh and Sikkim using Satellite Imagery. |
CPWD |
Arunachal Pradesh |
| 16 |
Consultancy Services for preparation of DPR and detailed design of Roads and Bridges etc. for construction of High-Altitude Hill Roads to Indo-China Border under Phase-II in the State of Jammu & Kashmir, Himachal Pradesh and Uttarakhand using Satellite Imagery. |
CPWD |
Jammu & Kashmir, Himachal Pradesh and Uttarakhand |
| 17 |
Consultancy services for feasibility study and preparation of Detailed Project Report for improvement and up-gradation of in principle declared National Highways in the state of Uttar Pradesh. |
MoRT&H |
Uttar Pradesh |
| 18 |
Consultancy Services for Preparation of DPRs, Structural Design, drawings for Construction of Flyover at Parimpora and Shalteng crossing on Srinagar bypass including allied works of NH projects of R&B Project Division Ist Srinagar. |
MoRT&H |
Srinagar |